School extension, Meinisberg

2024

A school complex from the 1950s is being renovated and expanded. A wooden front building creates space for today's requirements and gives the ensemble a new identity. Old and new: continuing to build as a matter of course.

Facts and images
Construction Data
Involved
Spacious teachers' room in the attic with unique window architecture
Spacious teachers' room in the attic with unique window architecture
Staircases with solid oak panels
Staircases with solid oak panels
Classroom with corner lighting
Classroom with corner lighting
Structure and stair detail
Structure and stair detail
Wood can be used to create design accents by dividing up the facade.
Wood can be used to create design accents by dividing up the facade.

The project
The municipality of Meinisberg is renovating its center: the school building from the 1950s is being expanded and supplemented with a wooden extension. The new double kindergarten is at ground level and opens onto the playground on the former temporary site. At the same time, a separate community center is being built opposite the playground, giving the village a clear address and blending into its surroundings with its single-story design. The new rooms are flexible, barrier-free, and tailored to today's teaching methods. The result is a harmonious ensemble that provides both the school and the administration with the space they need.

The construction method
The extension is built entirely of wood—including the elevator shaft. The staggered levels create quiet group rooms with a slightly elevated position, while the kindergarten benefits from a small outdoor arena. The roof houses a spacious room for the team. The intervention in the old building was minimal, supplemented by new group rooms and adapted safety features. The solar roof provides energy for the building's operation.

The challenge
In this school building extension, the different height differences between the floors in the longitudinal and cross-sectional sections from the existing building to the new building posed a particularly challenging problem.

Services of Timbatec

- SIA Phase 31 Preliminary project

- SIA Phase 32 Construction project

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Execution project

- SIA Phase 52 Execution

- SIA Phase 53 Commissioning

- Specialist fire protection planning

Client
Skop AG
8005 Zürich


Photography
Simon von Gunten Fotografie
4500 Solothurn